M/Y mosaique

PROJECT DATE: 2001
LENGTH: 50m
BUILDER: PROTESKAN
EXTERIOR: DUBOIS NAVAL ARCHITECTS Ltd.
INTERIOR: DONALD STARKEY DESIGN / KRISTINA FERRAND

Aqualuce worked together with Wayne Parker, at the time member or Donald Starkey Design Team to deliver an overall Interior and Exterior lighting design in 2002. This was also the first time LED lighting was used for Emergency Stair lighting.

M/Y mosaique

PROJECT DATE: 2001
LENGTH: 50m
BUILDER: PROTESKAN
EXTERIOR: DUBOIS NAVAL ARCHITECTS Ltd.
INTERIOR: DONALD STARKEY DESIGN / KRISTINA FERRAND

Aqualuce worked together with Wayne Parker, at the time member or Donald Starkey Design Team to deliver an overall Interior and Exterior lighting design in 2002. This was also the first time LED lighting was used for Emergency Stair lighting.